Our 2 in 1 Commercial model offers the Distribution Manager (load share system) and a Wi-Fi enabled EV charger all in one. This exciting new product offers the adoption of the BC road map to 2030 regulations, including a second 40 amp output for heat pumps, following the guidelines to a cleaner environment and electrification.
We use the existing wall plug from your Range or dryer and plug the prewired cord from our Distribution manager directly into the outlet, then plug the Appliance back into the Load Share. Now we can plug your heat pump directly into the Distribution Manager, it will then intelligently share the loads seamlessly and automatically between your car charger, your heat pump, while still leaving the priority setting to your Range or Dryer.
At Innovative Power & Distribution we offer custom designed load sharing products to assist single family homeowners - Strata buildings – and businesses with commercial strata lease property this is BY FAR the most popular upgrade for all EPR AND EV READY PLANS.
Load sharing uses one of your 240volt circuit breakers located in your pre existing main panel and essentially shares it between two devices both requiring 240 volts. If you load share your existing breakers there is no need to have to pay the high cost of upgrading your panel and main breaker size.
By using our smart technologies and Load Sharing device we can accommodate all types of voltage draws and customize amperage outputs. Designing every unit to protect each branch circuit INDIVIDUALLY with its own designated breaker. This protects the device that’s plugged into our product from overload or short circuit and does not require a CT to be installed on your main incoming power
Based in Cloverdale B.C. Canada, we are a LOCALLY MANUFACTURER and service our Load Share products. We offer the only retail store in North America that has electrical charging design and car charging products available for retail sales. We can assist our customers from beginning to end with all the steps to ensure smart energy at your fingertips.
IP Distribution can complete the federally mandated Electrical Planning Report (EPR) as required by the Strata Property Act, section 94.1, and the Electric Vehicle Ready Plan (EVRP) report for all commercial strata buildings, as well as charging solutions for commercial strata's and individual residences.
All of our products are designed to have PLUG AND PLAY models for consumers who want to install themselves.